STAKEHOLDER PRIORITIES
Principal:
- Not enough bathrooms and existing bathrooms need updating.
- Expand hardcourts and repave existing asphalt.
- Create an outdoor learning area for students to assemble at.
Based on survey results and Listening Session discussions in May and September 2021.
Teachers & Staff:
- Modernization of existing buildings / classrooms.
- Replace and expand hardcourts, repair playfields and track.
- Replace portable classrooms with permanent construction.
Based on online survey results from May 2021.
Students:
- Renovate and add restrooms across campus.
- Add more drinking fountains across campus.
- Create an outdoor learning area for students to assemble at.
Based on online survey results from May 2021.
SITE USE AND FUNCTIONALITY
General Education Classrooms
- Classroom space and storage is adequate but needs to be updated. Windows are not operable or efficient and need upgraded shading systems. Finishes are outdated and deteriorating. Cinder-block construction does not allow for hanging material on the wall. Would like to have tack-boards installed. Chromebook use demands more/updated outlets in the classrooms. Currently not enough secure storage for students personal items and music instruments.
Special Education Classrooms
- One class available and is located in a portable reporting good conditions.
Student Services / Counseling
- Finishes are outdated and need replacing. Space is limited but can accommodate small groups. Isolation rooms use empty classrooms which requires consistent movement to empty rooms.
Staff and Administrative Spaces
- Finishes are outdated and need replacing. Additional offices are desired.
Kitchen / Cafeteria / Food Service
- Currently using mobile food stations. Would like to transition to permanent food distribution areas. Kitchen is currently only used for preparation. There is an interest in utilizing the school garden.