STAKEHOLDER PRIORITIES
Principal:
- Complete renovation and modernization of the main building (including restrooms).
- Add an elevator to the main building.
- Add HVAC system.
Based on survey results and Listening Session discussions in May and September 2021.
Teachers & Staff:
- Modernization of Existing Buildings / Classrooms.
- Update exterior appearance and add curb appeal.
- Upgrade and update safety and security across campus.
Based on online survey results from May 2021.
Students:
- Modernize classroom spaces.
- Add and update drinking fountains across campus.
- Update restrooms across campus.
Based on online survey results from May 2021.
SITE USE AND FUNCTIONALITY
General Education Classrooms
- Classrooms across campus are in varying condition. The work spaces in room 5 are starting to overcrowd. The F wing needs sinks but are in otherwise good condition. The main campus building needs a renovation including efficient lighting. All classrooms could use an update to finishes and technology.
- There are completely empty classrooms on the second floor due to no elevator serving that area. This space would be very beneficial if there was adequate access, however these spaces also need a renovation.
Special Education Classrooms
- The special education classes are held in the portables. Portables are in need of repair, which is ongoing. The spaces are sufficient in size but there is a growing population that is going to require additional space to be added soon.
Student Services / Counseling
- Currently there are no counselors or additional services that serve the students.